Skip to main content

Cost to Serve  for new development 

A service connection is that portion of the water/wastewater line between the District’s pipeline, in a roadway or easement, and the meter or sewer cleanout. A building service is the piping from the meter/cleanout to the building. Properties may or may not have a service connection to the property. Also, a property may require a District line to be extended to serve the property.

Properties with a Service Connection

An existing service connection is one with a meter box (for water) and/or a cleanout (for wastewater) at the property line. Activation of the service connection is obtained by paying the required fees, submitting applicable information about the lot, and having a Customer Service Representative fill out a Utility Service Request (USR) form. The signed USR form will initiate the installation of the water meter, inspections, and bi-monthly service charges. The current fees are included with this packet.

The following information is required to be included with the USR form.

  •  The approved County plot plan, or site plan, showing the location of the service(s) to the   building and    CCWD stamp;
  • A copy of the County Building Permit and/or on-site sewage disposal permit;
  • The Sewage Pumping System data sheet, if applicable;
  • Accessory Dwelling Permit, if applicable;
  • Easement(s), if applicable; and
  • A copy of the Quote for New Service (described below), if requested.

Please contact the customer service department once all items are obtained. 

 


 

Join our mailing list